Sunday 8th November 2020
SESSION ORGANISER
Find out about GoodGym TaskForce
Report written by Peter Van Tongeren
Due to the current lock-down, the intended group session at the SHP's Greenhouse Project allotment had to be postponed. Luckily single missions are still ok, so a repair session went ahead this afternoon.
Previously there was damage to the roof panels of the shed, perhaps due to the branches of the walnut tree next to it. The holes were already sorted, but the tree branch was still rubbing along the roof, so lobbers & a small but sharp hand saw took care of that.
The greenhouse was in need of some tlc as well, with several of the side panels loose inside. After some puzzling to find out what went where, all available panels were back in their spot. One empty slot will need a new panel and the door will still need some attention - anyone got creative ideas to replace broken hinges? With the panels about in place, next time we can have a look at sorting the inside of the greenhouse
Note: the two roof panels were deliberately left out at L's request.
Redbridge
Will give you that little spring in your step;)